Skip to content
Top Menu
February 5, 2023
  • About Us
  • Contact Us
  • Facebook
  • Youtube
  • Twitter
  • Pinterest
  • Google+
Civil Snapshot

Civil Snapshot

Civil Engineering Knowledge

  • Home
  • Civil Engineering
  • Concrete
  • Structural
  • Construction
  • Surveying
  • Steel Structure
Main Menu

Tag: Concrete Placement

After Concrete Placement

November 5, 2022November 5, 2022 - by Kathir - 2 Comments.

24 hours after placing concrete curing should be carried out for continuously 7 days. Curing can be done in several methods depending on the structure. Water sprinkling/spraying  – Plastering surfaces …

After Concrete Placement Read More

Trending

  • Difference Between Plane Surveying and Geodetic Surveying
  • Difference between English Bond and Flemish Bond
  • Difference Between Prismatic Compass and Surveyors Compass
  • Sources of Errors in Surveying Measurement
  • What is Shear Wall Why and Where it is Provided
  • Why Crank Bars are Provided in Slab

Popular Posts

  • Difference Between Plane Surveying and Geodetic Surveying
  • Difference between English Bond and Flemish Bond
  • Difference Between Prismatic Compass and Surveyors Compass
  • Sources of Errors in Surveying Measurement
  • What is Shear Wall Why and Where it is Provided
  • Why Crank Bars are Provided in Slab

Follow us on Facebook

Copyright © 2023 Civil Snapshot.
Powered by WordPress and HitMag.