A column is to build with 4% concrete volume. So the steel required for that column is
= (4/100) x 1 x 7850 [Density of 1m³ steel = 7850 kg]
Steel requirement for RCC beam = 1 to 2% or 78.5 kg to 157 kg/m³
Steel requirement for RCC column = 0.8 to 6 % or 62.8 kg to 471 kg/m³
Steel requirement for RCC Slab = 0.7 to 1% or 55 kg to 78.5 kg/m³
Steel requirement for RCC Lintel = 0.7 to 1% or 55 kg to 78.5 kg/m³
Steel requirement for Foundation = 0.5 to 0.8% or 34.25 to 62.8 kg/m³